Current Programs in American Post-Secondary Wood Design Education
Wood engineering has been a requirement in civil/structural engineering education curricula forcenturies. In 1990, a comprehensive survey was conducted of wood engineering educationprograms...

2008 Civil Engineering Industry Buyer' Guide
A Special Supplement to Civil Engineering Magazine
This guide covers the following topics: Construction materials; Geotechnical and environmental; Information technology; Pipelines, sewers, and accessories; Professional and professional...

Building Code Requirements and Specification for Masonry Structures
Containing Building Code Requirements for Masonry Structures (TMS 402-08/ACI 530-08/ASCE 5-08, Specification for Masonry Structures (TMS 602-08/ACI 530.1-08/ASCE 6-08) and Companion Committees
The Code covers the design and construction of masonry structrures while the Specification is concerned with the minimum construction requirements for masonry in structures. Some of the...

Achievements and Challenges of China Construction
China is at the starting point of an accelerative urbanization process. A great number of infrastructural projects and residential areas are under construction. This paper provides an...

Post and Pad
As the name implies, this type of foundation consists of a concrete or wood pad placed on or buried in the ground. It is the lowest priced option for buildings on frozen silt, which may...

Adjustable Foundation Design Development Innovations in Arctic Engineering
The purpose of adjustable foundation systems is to accommodate a wide variety of soils, including those which have low bearing capacity or which may be subject to settlement and/or horizontal...

Some Case Histories of Pile Foundations in Permafrost
Foundations for permafrost conditions should conform to one of three basic design principles: keep it frozen, let it thaw, or thaw the ground before construction. To keep the permafrost...

Geotechnical Reports
This section discusses the geotechnical data report, geotechnical memoranda for design, and the geotechnical baseline report....

Preparation of a Geotechnical Baseline Report
This section discusses the preparation of a geotechnical baseline report. Topics include organization and content, writing the GBR, wording suggestions, and consistency and compatibility....

Applications for Other Excavations and Foundations
This section discusses the application of GBRs for other excavations and foundations projects, projects involving construction operations other than tunneling....

Roles and Responsibilities
This section summarizes the roles and responsibilities of the parties involved: owner, design team, contractor, construction manager, and dispute adjudicators....

Structural Condition Assessment
In Structural Condition Assessment, editor-in-chief Robert Ratay gathers together the leading people in the field to produce the first unified resource on all aspects of structural condition...

Structural Safety and Its Quality Assurance
Sponsored by Committee 9A/10 of the Council on Tall Buildings and Urban Habitat of the Structural Engineering Institute of ASCE. This report uses an...

The New Tacoma Narrows Suspension Bridge Introductory Project Information
On September 25, 2002, Notice-to-Proceed for a design-build agreement was issued by the Washington State Department of Transportation (WSDOT), directing Tacoma Narrows Constructors (TNC),...

New Shear Stud Provisions for Composite Beam Design
The 2005 American Institute of Steel Construction (AISC) Specification for Structural Steel Buildings (AISC 2005) will contain significant changes to the shear connector provisions for...

Calendar: A 1986 Calendar Illustrating the Statue of Liberty: An International Historic Civil Engineering Landmarks
Illustrations include: Castle Garden, NY 1892; Construction of the Head; Presentation of the Statue of Liberty in Paris, 1988 / The Eiffel Tower; The Foundation; Gustave Eiffel.s Support...

Toronto Takes Off
Travelers using Toronto's Pearson International Airport will soon be passing through a new, state-of-the-art terminal, the centerpiece of a 10-year airport redevelopment project....

Crossing the Hollandsch Diep
The design/build team charged with creating an aesthetically pleasing bridge in the Netherlands for high-speed rail faced tough requirements, among them tight construction tolerances and...

Repairing Pittsburgh's Portal
Engineering the rehabilitation of Pittsburgh's Fort Pitt Bridge and Fort Pitt Tunnel involved an extensive inspection of their condition and a detailed evaluation of alternative...

The Road from Kabul to Kandah?r
To have any hope of successfully rebuilding its ware-ravaged economy, Afghanistan will need a reliable transportation infrastructure. Reconstruction this heavily mined highway under a...

 

 

 

 

Return to search